Cleaning

Post-construction cleaning in Calgary

Construction dust is not dirt on a surface. It is fine, abrasive, and suspended in the air for days after the work stops — which is why a space cleaned once looks dusty again the following morning.

One clean is never enough. That is physics, not effort.

Drywall dust is light enough to stay airborne long after the sanding stops. Clean while it is still falling and you have cleaned the air, not the room. So the work is done in passes, spaced around the trades rather than crammed into one day.

Three passes

  1. Once the trades are out

    Rough clean

    Debris, offcuts, packaging and the heavy dust removed so the space can be worked in and properly assessed. Nothing delicate happens yet.

  2. After the last dusty trade

    Final clean

    Top down and inside out — light fittings, vents, door tops, inside cupboards, window tracks, paint and adhesive off glass, floors last.

  3. Just before handover

    Touch-up

    The settled layer that appears after everything else stops. This is the pass that decides whether the space reads as finished.

A large window in a newly built room

Glass, frames and tracks. Splashes of compound and adhesive come off with a blade and patience, not a cloth.

New flooring in an empty finished room

Floors last, every time. Grit dragged across a new finish on the first pass is the damage nobody can undo later.

Surface by surface

Every finish wants something different.

  • Glass and frames

    Compound, silicone and adhesive come off with a blade and lubricant, worked in one direction. Tracks and weep holes cleared, not just wiped.

  • New floors

    Vacuumed before anything wet touches them, then a cleaner matched to the finish. Grit dragged across a fresh coating is the damage nobody can undo.

  • Millwork and doors

    Inside every cupboard and drawer, tops of doors and frames, hinge knuckles — the places dust sits and a walkthrough finds.

  • Fixtures and services

    Light fittings, vents and diffusers cleaned before the system runs, so the first hour of heating does not redistribute the dust.

  • Washrooms and kitchens

    Protective film off, grout haze removed, stainless polished with the grain, aerators flushed of debris.

  • Paint and finishes

    Overspray and drips lifted without solvent on a fresh coating — which is a patience problem, not a chemical one.

Method & handover

Four rules, and none of them are negotiable.

Equipment is HEPA-filtered, blades and pads are fresh per area, and cleaners are matched to the finish rather than to the mess — a degreaser that saves ten minutes on a new coating costs a great deal more than that to put right.

  • HEPA filtration throughout

    Standard vacuums pass fine drywall dust straight through the bag and back into the air, which is why a space looks dusty again by morning.

  • Dry before wet, always

    Water on construction dust makes a slurry that sets into grout and grain. Everything is removed dry first.

  • Top down, floors last

    Ceilings, then walls and fixtures, then floors — so nothing already cleaned gets rained on by what comes after.

  • Walked with you at handover

    We go round with the builder or owner and take a snag list. Anything on it is dealt with before we call it finished.