A bathroom in marble with twin basins

Renovations

Bathroom renovations in Calgary

A bathroom is a small room that punishes shortcuts. Everything in it is either wet or next to something wet, and the parts that matter most — waterproofing, drainage, ventilation — are the parts you will never see again once the tile is on.

Design direction.

The standard and the aesthetic we work toward with clients.

A bathroom with a floating vanity, a wide mirror and a glass shower screen
A bathroom with twin basins, lit mirrors and a freestanding bath
A marble bathroom with a walk-in shower and wall-hung fittings

The scope

What a bathroom renovation includes.

Before demolition

  • What the drainage and floor structure allow
  • Fixture positions agreed
  • Tile and fixture selections confirmed

Rough work

  • Strip-out to studs and subfloor
  • Supply, drainage and a fan ducted outside
  • Blocking for vanity, glass and grab bars

The part that lasts

  • A flat, rated substrate
  • Continuous waterproof membrane, flood tested
  • Tile, fixtures, wet test and walkthrough

How it runs

  1. Drainage and strip-out

    Where the soil pipe runs and what the floor allows, then everything out to the studs.

  2. Rough-in and blocking

    Supply and drainage set, the fan ducted outside, blocking in for every fixture and panel.

  3. Substrate and waterproofing

    A flat, rated substrate and a continuous membrane, flood tested before a single tile.

  4. Tile, fixtures, handover

    Tile to a planned layout, then vanity, valves and glass, a wet test and a walkthrough.

Bathroom tiling in progress on a prepared substrate

What moves the price

What decides a bathroom's price.

We don't price bathrooms by size. Whether the toilet moves and how the shower is built matter far more than the floor area, and a site visit settles both.

Whether the toilet moves

Moving it means moving the soil pipe, and the fall has to work in the floor you already have.

Shower construction

An acrylic base is a fraction of a fully tiled, waterproofed shower. Curbless costs more again.

Tile choice and size

Large format needs a flatter substrate; pattern takes far longer to set. Labour is the bigger half.

What the strip-out finds

Rot, failed waterproofing or a soft subfloor, priced and approved before it proceeds.

What sets the schedule

What sets a bathroom's schedule.

Which is why we won't put a number on it until we've opened the room. Two of these are waits nobody can compress, and skipping either is how a bathroom fails early.

  • What the strip-out uncovers

  • Membrane cure before the flood test

  • Glass fabrication after templating

  • Tile size, pattern, and layout

  • Whether it is the only bathroom

Permits

When a bathroom needs a permit.

Plumbing and electrical work carry their own permits, and moving fixtures or a wall adds a building permit. We confirm which apply at the scope stage and book the inspections ourselves.

  • Plumbing permit where drainage or supply is relocated
  • Electrical permit for new circuits, fans, or heated floors
  • Building permit where structure or layout changes
  • Rough-in inspection before waterproofing and tile
  • Final inspection where permits apply

Tell us what the bathroom needs to do.

Or just call. Nothing here has to start with a form.

Call us