Before we quote
We meet, look at the building rather than the plan, and write the scope down. You owe nothing until you have both a scope and a number.

Process
Most disputes come from an assumption nobody wrote down. This is the division of labour, agreed in advance.
The shape of it
The same sequence on a single bathroom and on a whole-home renovation. Only the length of it changes.

01 — 03
No charge
We meet, look at the building rather than the plan, and write the scope down. You owe nothing until you have both a scope and a number.

04 — 06
Quoted first
The price, the drawings and the calendar, all agreed before a trade is booked. Anything chargeable is quoted before it starts.

07 — 09
Fixed scope
Coordinated and supervised, checked at each stage rather than at the end, and walked through with you before it is called finished.
The nine stages
A conversation about what you want and whether we are the right people to do it.
What we need from you
What we handle
You receive, in writing
A short summary of what was discussed and what happens next
Straight after we speak
We look at the building itself, because that is what decides whether the plan is buildable.
What we need from you
What we handle
You receive, in writing
An assessment note listing the conditions that affect scope
Before anything is priced
The document every later decision refers back to, including the disagreements.
What we need from you
What we handle
You receive, in writing
A written scope of work for your approval
Before quoting begins
Pricing built from the approved scope, line by line.
What we need from you
What we handle
You receive, in writing
A line-itemed quote with allowances stated openly
At no charge
Where layouts, materials, and finishes get settled — and where lead times start counting.
What we need from you
What we handle
You receive, in writing
A selections schedule with a decision deadline against each item
Before any ordering starts
Trades sequenced in the order the building requires, not the order they are available.
What we need from you
What we handle
You receive, in writing
A schedule showing trade order and the inspection holds between them
Before work starts on site
The visible part, run by the invisible part.
What we need from you
What we handle
You receive, in writing
Progress updates, and any change order priced before it proceeds
As the work runs
Work checked while it can still be corrected without undoing something else.
What we need from you
What we handle
You receive, in writing
Inspection records and a sign-off at each stage
As each stage closes
The end of the work, and the point at which you get everything on paper.
What we need from you
What we handle
You receive, in writing
Deficiency list, warranties, and permit documentation
At handover