Reference image: a modern kitchen with an island

Renovations

Kitchen renovations in Calgary

A kitchen is the most trade-dense room in a house. Demolition, framing, plumbing, electrical, HVAC, drywall, paint, flooring, cabinetry, stone, and tile all have to happen in a particular order, and every one of them is waiting on the one before. Sequencing is most of the job.

Reference image

Design direction.

These are references — the standard and the aesthetic we work toward with clients, not photographs of OPCLAR projects. Our own project photography will appear here as work completes.

A finished kitchen with full-height cabinetry
A kitchen island with a stone countertop
Tiled backsplash and counter detail in a finished kitchen

The scope

What a kitchen renovation includes.

Design and decisions

Layout worked around plumbing stacks and load-bearing walls · Appliance specifications confirmed before cabinets are ordered · Cabinet, counter, tile, and hardware selections · Lighting plan with considered switching · Written scope and line-itemed quote

Rough work

Demolition with containment and floor protection · Framing changes and blocking for cabinets and hardware · Plumbing relocated for sink, dishwasher, and any island · Circuits, appliance feeds, and lighting by licensed trades · Range ventilation ducted to the exterior

Fit-out

Drywall, taping, and paint · Flooring run to the correct extent under cabinets · Cabinets set, levelled, and scribed to the walls · Countertops templated after cabinets are set · Backsplash, hardware, and fixture installation

Completion

Appliances installed and tested · Inspections passed where permits apply · Adjustment of doors, drawers, and soft-close hardware · Post-construction clean · Walkthrough and deficiency list

How it runs

  1. Layout and what cannot move

    The plumbing stack, the load-bearing walls, the gas line, and whether the range can vent out the wall you want it on. The cheapest change is the one made on paper.

  2. Selections and ordering

    Cabinets and stone have lead times, and appliances have exact rough-in dimensions. Models are confirmed before cabinets are ordered.

  3. Strip-out

    Containment up, floors protected, old kitchen out. In an older house this is where the surprises are, and we look before committing to the rough-in.

  4. Rough-in and inspection

    Framing, blocking for uppers, plumbing moved, circuits pulled, ventilation ducted out — all inspected before anything is covered.

  5. Drywall, paint, and flooring

    Finished before the cabinets arrive, because painting around installed cabinetry is slower and never as clean.

  6. Cabinets, counters, and finishing

    Cabinets set and scribed, counters templated to what is actually there, then backsplash, hardware, appliances and a walkthrough.

Kitchen cabinetry part-way through installation

What moves the price

What decides a kitchen's price.

We don't price kitchens by the linear foot of cabinet. Whether the layout moves, and which appliances you choose, shift the number more than the finish level does.

  • Whether the layout moves

    Keeping the sink, range and appliances roughly where they are keeps plumbing and electrical simple. Moving the sink across joists does not.

  • Cabinetry

    The largest line in most kitchens, and the widest range — stock, semi-custom and custom are three different budgets.

  • Countertops

    Material, edge detail and the number of seams matter more than square footage.

  • Ventilation

    A range hood ducted to the exterior is the correct answer and sometimes the expensive one, depending on how far the duct has to travel.

  • Electrical capacity

    Modern appliance loads and lighting often need circuits an older panel does not have spare.

  • What is behind the walls

    Undersized wiring, tired plumbing, or framing notched by a previous trade. Priced and approved before the work proceeds.

What sets the schedule

What sets a kitchen's schedule.

Which is why we won't put a number on it until we've seen the room. The estimate says what your kitchen involves, not what an average one does.

  • Cabinet and stone lead times

  • Whether the layout moves

  • Appliance availability

  • Permit turnaround at the City

  • Whether you are living in it

Permits

When a kitchen needs a permit.

Most kitchens need permits for the electrical and plumbing work even when the layout stays put, and a building permit as soon as a wall moves. We establish which apply before you commit, and book the inspections.

  • Building permit where structural changes are involved
  • Electrical permit for new or altered circuits
  • Plumbing permit where supply or drainage moves
  • Gas permit for a relocated range connection
  • Rough-in inspection before close-up

Show us the kitchen. We'll show you the sequence.

Or just call. Nothing here has to start with a form.